NGUYEN, Dinh Tung. Optimization of the Possibility of Dropping Materials on the Flip-over Bridge for Cassava Roots with Lifting Capacity of 60-80 tons. JST: Engineering And Technology For Sustainable Development, [S. l.], v. 31, n. 5, p. 24–30, 2021. DOI: 10.51316/jst.154.etsd.2021.31.5.4. Disponível em: https://jst.vn/index.php/etsd/article/view/261. Acesso em: 1 jul. 2025.