[1]
D. T. Nguyen, “Optimization of the Possibility of Dropping Materials on the Flip-over Bridge for Cassava Roots with Lifting Capacity of 60-80 tons”, ETSD, vol. 31, no. 5, pp. 24–30, Nov. 2021.